Residential complex Green Line

One of our major projects implemented in Batumi – Residential Complex “Green Line” been equipped by us with central wastewater system, pumping station, fire-fighting system

Hotel “Neptun Palace”

Hotel “Neptun Palace”, Kvariati, Georgia. Total capacity of heating systems boilers 300 000 Kcal/h. Water and fire boosters. Swimming pool 450 m3

ZAHESI concrete plant

ZAHESI water supply system for the concrete producing plant. Total capacity of the boilers 410kW

Private residence

Private residence at Lisi lake. HV system, water supply and Solar systems. Total capacity of boilers 120000 kcal/h. Solar system capacity 20000 kcal/h.

Hotel “Premier Best Western”

Hotel “Premier Best Western”, Batumi, Georgia. Heating and Ventilation, Water heating system, the Swimming pool, Water booster, the Sauna. Total capacity of boilers 494 500

Private residence

Private residence at Lisi lake. HV system, water supply and Solar systems. Total capacity of boilers 120000 kcal/h. Solar system capacity 20000 kcal/h.

ვრცლად